This thesis mainly do the following: First, the deteriorating items inventory contractual and collaborative programming coordination modeling is built by the multi-level programming and construct respectively second-level, third-level different coordination structure model. 本文主要做了以下工作:第一,用多层规划为多阶段易腐品库存协调建模,分别构建二阶、三阶易腐品库存协调结构模型。